Des Moines Project
In October 2022, we worked with the City of Des Moines to improve and upgrade the Redondo Waterfront area and Woodmont Road. The Kent Prep Crew worked to demo and grind the preexisting asphalt and concrete. Once the prep work was done, Kent Paving Crew laid the new asphalt and worked to finish the project. To keep traffic running smoothly and keep everyone safe, Kent Traffic Control worked alongside the crews throughout the duration of the project. The Des Moines project was longer in scope and took 25 working days to complete. In addition to the road work done, the Kent crew added Ductile pipe and new catch basins, removed and replaced concrete, adjusted utilities, and striped the roads.